
Nearly half of the copper will be mined using Rio Tinto's low-carbon Nuton process
When you purchase through links on our site, we may earn an affiliate commission. Here’s how it works .
(Image credit: Getty / JHVEPhoto) Share Share by: Copy link Facebook X Whatsapp Reddit Flipboard Share this article 0 Join the conversation Follow us Add us as a preferred source on Google Amazon has struck a deal to buy up the first new U.S.-mined copper in more than a decade to fuel its AI data centers in the country, WSJ reports. The agreement, inked with Rio Tinto, will provide some of the copper using the mining company's innovative new Nuton Technology, which drastically reduces the mine-to-market chain. It follows multiple reports in 2025 that copper markets are feeling the pinch due to aggressive AI expansion , with industry watchers warning that only 70% of 2035 demand could be met .
As WSJ notes, the copper will be sourced from Gunnison Copper's Johnson Camp mine in Arizona, a mine which has been restarted as a testbed for Rio Tinto's new method for opening up low-grade deposits. This Nuton Technology was deployed at an industrial scale at the Johnson Camp copper mine last month, according to Rio Tinto . "The process produces 99.99% pure copper cathode at the mine gate and removes the need for traditional concentrators, smelters and refineries, significantly shortening the mine-to-market supply chain," the company explains. The extraction method purportedly uses substantially less water and produces lower carbon emissions compared to conventional methods.
According to WSJ, the new deal "will satisfy only a sliver of Amazon’s needs." That's because each of Amazon's mammoth data centers require tens of thousands of tons of copper. The Arizona Nuton output is expected to be 14,000 metric tons in four years, according to the report, not even enough for one such facility. Rio Tinto notes that a further 16,000 tonnes will come from a conventional run-of-mine leaching pad. This will push the deal's output to nearly 30,000 tonnes, but ensures that less than half will be delivered using the more environmentally friendly method.
AI data-centre buildout pushes copper toward shortages, analysts warn
Key considerations
- Investor positioning can change fast
- Volatility remains possible near catalysts
- Macro rates and liquidity can dominate flows
Reference reading
- https://www.tomshardware.com/tech-industry/artificial-intelligence/SPONSORED_LINK_URL
- https://www.tomshardware.com/tech-industry/artificial-intelligence/amazon-buys-first-american-mined-copper-in-a-decade-arizona-mine-to-fuel-aws-ai-data-centers-in-seismic-two-year-deal#main
- https://www.tomshardware.com
- AMD's upcoming Ryzen AI Max+ 392 hot on the heels of 9800X3D in early benchmarks — New Strix Halo APU almost matches Ryzen 7 beast in multi-core performance
- SK hynix shows 16-Hi HBM4 memory for AI accelerators — 48 GB at 10 GT/s over a 2,048 interface
- Troublesome 16-pin connector sidelines $30,000 H200 Hopper GPU — repair technician saves the data center day by fixing power port
- Survive the Quarantine Zone and More With Devolver Digital Games on GeForce NOW
- Milk-V Titan Mini-IX board with UR-DP1000 processor shows RISC-V ecosystem taking shape — M.2, DDR4, and PCIe card support form a kit that you can use out of th
Informational only. No financial advice. Do your own research.